Different representations of a district. The labels alone did not indicate different assets.
Schematic of the documented district-code reconciliation.
RESOLVEDThe district-code mismatch
ESTABLISHEDDated reported production
STILL REQUIREDEvidence for a site decision
Texas Regulatory Evidence
Asset Identity
Evidence Position
UNKNOWN Preservation
Engineering Intelligence
Human Review
Frozen Revision
Controlled Release
Governed Technical Record
01
A discrepancy resolved.
The PDQ district code 10 and the EWA district label 08 initially appeared inconsistent. The RRC district lookup maps code 10 to label 08, Midland. The labels alone did not indicate different assets.
Reading a code in its source context changed how the apparent conflict should be understood.
02
A production claim bounded.
We traced the API to dated gas production records. Those volumes establish historical gas production reported for the well under its RRC gas ID; they do not establish gas available for a new project.
The distinction matters when a historical production figure becomes part of a prospective energy-to-compute discussion.
03
The next evidence made explicit.
Current flow measurements, gas quality, gas-use rights and pipeline access still require evidence before a site decision.
A useful finding also makes the next investigation clearer: what to measure, what to verify and which question remains open.
12
MATERIAL PARAMETERS LEFT UNKNOWN
Knowing where the evidence stops.
In ZAI’s first real-world governed execution, twelve material engineering parameters were preserved as UNKNOWN rather than estimated. Preserving uncertainty is a feature of the methodology, not a gap in the report.
Methodology reference only. CAPITAN did not commission, purchase, endorse, approve or certify ZAI’s services.
Your asset. Your next question.
For an accepted engagement, we apply this method to your own asset and decision: a human-reviewed report with findings, dated sources, unresolved issues and specific next evidence requests.